Concrete Supply for
Housing Estates.
Two Midlands plants, 50m³+ daily capacity each, one named coordinator. Programme-led supply for plots, estate roads, drainage and floor slabs. 30-day trade terms for approved accounts.
Trusted by
What We Supply
Every pour, every phase of the build
From first dig to final snagging. Foundations through to floor slabs, kerbs, drainage and estate infrastructure.
Plot foundations
Trench fill, oversite, and blinding for 20-200 plot schemes. Wagon scheduling matched to your build programme.
Estate roads & kerbs
C32/40 paving concrete, kerb races, and haunching. Booked in rotation to keep your groundworks gang moving.
Drainage & manholes
ST2/ST4 bedding and surround concrete for SW/FW runs. Certificates sent same-day with every delivery.
Floor slabs
Power-float grade C32/40 or fibre-reinforced mixes for garage blocks, communal areas, and commercial units.
Why National & Regional Builders Choose Us
The details that keep your programme on track
Schedule-led supply
Your site manager speaks to one named coordinator. No call centres. Programme changes flagged the same hour, not the next day.
Two plants, one contract
Coventry and Melton Mowbray cover the full Midlands footprint. If one plant is stacked out, the other picks up, zero impact to your pour window.
QSRMC-certified mixes
Every mix design is QSRMC and BSI Kitemark accredited. Delivery tickets, batch records and compliance certificates are stored and accessible on request.
Wagons on rotation
For continuous pours we run wagons back-to-back, 20-minute rotation per plant. Large slab pours and raft foundations handled in a single shift.
30-day trade terms
Approved trade accounts: invoice at month-end, settled 30 days. Consolidated statements, named accounts controller, priority booking on your PO.
Site-safe & compliant
ISO 9001, CHAS, Constructionline, CSCS-accredited drivers. Toolbox talks and RAMS supplied with every new site set-up.
How It Works
From tender to wagons on site
Programme brief
Send us your build programme, site address and pour schedule. We confirm plant capacity and mix availability against your dates within 24 hours.
Mix designs & quotations
Fixed rate card for the contract duration. Mix designs signed off against your engineer's spec. Terms agreed in writing before first delivery.
Account set-up
Credit check, references, trade account opened. PO system wired up to our scheduling, your site clerk books deliveries via named coordinator.
Supply & rotate
Weekly programme updates. Wagons dispatched to schedule. Issues flagged before they become problems, we pick up the phone first.
Request a Tender Pack
Let's talk about your programme
Send us your scheme details, we'll come back within 24 hours with plant capacity, mix designs and a fixed rate card for the contract duration.
- Named coordinator, direct line
- 30-day trade terms for approved accounts
- QSRMC, BSI Kitemark, CHAS, Constructionline
- All documentation & certs on request



